Skip to content
Research

The cost of manual work: a simple model you can reuse

A transparent formula for estimating what a repetitive task really costs a team per year and how quickly an automation pays for itself.

By Mechane Forge5 min read
Short answer

Estimate a task’s annual cost as people × weekly hours × 46 weeks × loaded hourly cost, multiply by the share you can realistically automate, then divide the build cost by monthly savings to get payback. For example, four people spending five hours a week at $30 an hour cost about $27,600 a year.

Ask a team how much time a repetitive task takes and you will hear “not that much”. Ask them to count it and the number is usually larger. This note gives you a simple, transparent model to put a figure on it, so a decision to automate rests on arithmetic rather than instinct.

How do you calculate the cost of manual work?

  1. 01Hours per year = people doing the task × hours per person per week × working weeks (use 46).
  2. 02Annual cost = hours per year × fully loaded hourly cost (salary plus overhead, not just wage).
  3. 03Recoverable cost = annual cost × share of the task that can realistically be automated.
  4. 04Payback (months) = build cost ÷ (recoverable cost ÷ 12).

What does a worked example look like?

Four people each spend five hours a week copying enquiry details between a form, a spreadsheet and a CRM. At 46 weeks that is 920 hours a year. At a loaded cost of $30 an hour, that is $27,600. If 70 percent can be automated, the recoverable amount is $19,320 a year, about $1,610 a month. A $12,000 build pays back in roughly 7.5 months.

These numbers are illustrative. Replace them with your own, and be conservative about the share you can automate.

What the model leaves out

  • Error cost: rework, missed follow-ups and wrong data have a price the model ignores.
  • Speed: a faster response to a lead or customer can be worth more than the hours saved.
  • Morale and focus: people do better work when the dull part is gone.
  • Maintenance: a build has running costs, usually small relative to the savings.

Use the model as a floor, not a ceiling. Try it with your own figures in our automation ROI calculator.

Have something that should run itself?

Tell us what is slowing your team down. We will come back within one working day with an honest view on whether it is worth building and what it would take.